Back to All Projects
Construction•Mysuru
Natesh
Modern duplex home planned for family privacy, comfortable circulation and natural ventilation.
Built-Up Area4,200 sq.ft
Project Duration10 Months
Year Completed2025
LocationMysuru
The Client Brief & Context
The Challenge
Constructing on an uneven contoured site requiring careful foundation stepping to prevent differential soil settlement.
Architectural Response
The KJC Solution
Implemented stepped trapezoidal RCC footings with grade-level continuous tie plinths and sub-soil drainage channels.
Engineering & Execution Standards
Stepped isolated footings engineered for variable bearing red loam soil
Full-time site civil engineer monitoring daily bar bending schedules
Independent 7-day and 28-day concrete cube compression lab test reports
Concealed CPVC plumbing lines hydrostatically tested at 10 bar pressure
Materiality & Spec
Teak WoodPrimary SteelToughened GlassVitrified Tile
"KJC's civil team adhered strictly to the timeline. We received weekly WhatsApp photo logs and had zero surprise cost escalations."
— Natesh, Homeowner, Mysuru
Commission a Project Like This
Schedule a feasibility review with our lead architect and civil engineering team.